Case Study

Caprock Solar Power Project

The Caprock Solar Power Project was completed in late 2016 and generates enough energy to power about 5,000 average homes. The power from the project is sold to Western Farmers Electric Cooperative under a 25-year agreement. EPC contractor Swinerton Renewable Energy built the solar project, which consists of more than 103,000 solar panels manufactured by Jinko Solar.

Have a question for us? Let’s talk.

Duke Energy Utility Account Inquiries:

This form is not for questions about your electric or gas service from Duke Energy. Duke Energy Sustainable Solutions does not have access to your utility account information.

If you have a problem or question about your electric or gas service, please contact Duke Energy’s customer service for help.

Call Us Directly

To talk with one of our sustainable energy consultants immediately, call 844.732.7652.

Need Customer Support?

Existing Duke Energy Sustainable Solutions customers with questions should call 844.732.7652 or email sustainablesolutions@duke-energy.com.